RushTrackAcceso seguro
RUSHTRACK / ACCESS

Verificando tu acceso

Estamos completando tu ingreso de forma segura. Solo va a tomar un momento.

Acceso seguro a tu espacio de trabajo

Getting started

Get started with RushTrack

A practical path for creating a project, building its schedule, and connecting team, facility, and operational modules.

Written by RushTrack Product TeamOperational review CinergiaPost S.R.L.
01

RushTrack works best when the project structure is created in sequence. Start with scope and schedule, then let that context inform staffing, resources, specialized workflows, and finance.

02

1. Create the project

Define the production context used throughout the platform.

  • 01Name, format, episodes, and platform
  • 02Production and delivery dates
  • 03Workspace roles and owners
03

2. Build the operating plan

Create the calendar and review the demand it generates.

  • 01Milestones and dependencies
  • 02Team roles and periods
  • 03Post Facility and resource capacity
04

3. Activate specialist workflows

Use the modules required by the project while keeping one shared reference.

  • 01VFX, sound, ADR, and color
  • 02Finance and vendors
  • 03Master Library, QC, and delivery

Bring the entire operation into one place.

Discover RushTrack and connect schedules, people, resources, costs, and deliveries.

Discover RushTrack