RushTrackAcceso seguro
RUSHTRACK / ACCESS

Verificando tu acceso

Estamos completando tu ingreso de forma segura. Solo va a tomar un momento.

Acceso seguro a tu espacio de trabajo

Post Facility guide

Configure Post Facility resources

How to model rooms, workstations, storage, servers, shifts, and capacity for project assignment.

Written by RushTrack Product TeamOperational review CinergiaPost S.R.L.
01

A Post Facility becomes operationally useful when its resources can be compared with project demand. RushTrack keeps physical capacity and project assignment in the same context.

02

1. Register infrastructure

Describe the capacity that can actually support work.

  • 01Rooms and workstation types
  • 02Storage and servers
  • 03Shifts and operating windows
03

2. Define availability

Separate theoretical capacity from resources that are active and assignable.

  • 01Operational status
  • 02Reserved or unavailable periods
  • 03Shared resources and constraints
04

3. Compare project demand

Evaluate rooms, shifts, staffing, and storage before confirming assignment.

  • 01Projected occupancy
  • 02Capacity warnings
  • 03Alternative facility or resource plan

Bring the entire operation into one place.

Discover RushTrack and connect schedules, people, resources, costs, and deliveries.

Discover RushTrack